Everton Stadium (Hill Dickinson Stadium)

Liverpool, United Kingdom, Europe

Completed · Sports · Football Stadium On Reclaimed Dock · Temperate · 2025

A 52,888-seat Premier League stadium built on the infilled Bramley-Moore Dock on Liverpool's northern waterfront. It was delivered from planning to handover in roughly five years, partly through extensive off-site manufacture. The dock basin was filled with around 480,000 cubic metres of marine sand to form the foundation platform.

Innovation highlights

  • Five-year delivery for a major stadium via modern methods of construction
  • Dock-basin infill foundation on a heritage waterfront
  • Double-stepped precast terracing units
  • Recycled-content structural steel

Innovations in the catalogue

  • Double-Stepped Precast Terracing Units
  • Marine-Sand Dock Infill Foundation Platform
  • No-Blockwork Prefabricated Envelope Strategy
  • Recycled-Content Structural Steel Frame
Client / Developer
Everton Football Club
Architect
MEIS Architects (Dan Meis)
Engineer
Buro Happold; Laing O'Rourke (design-build); Severfield (steelwork)
Type
Football Stadium on Reclaimed Dock

#stadium #DfMA #waterfront #off-site #heritage dock

View source