Keey Aerogel — Green Silica Aerogel from Construction Waste

Product · Building Envelope

Product · InnDex 35 · Evidence provided · High specification risk

Ultra-low-density silica aerogel (98% air) made from construction waste using recycled CO2 and ethanol.

Keey converts demolition waste into silica aerogel for thermal insulation in building envelopes. The closed-loop production process substitutes recycled CO2 and ethanol for virgin materials, targeting lower embodied energy and carbon than conventional aerogel synthesis. A pilot plant has operated since 2022; Series A funding (€18M, Jan 2025) supports scaling to commercial production in France's Grand Est region.

Keey converts demolition waste into ultra-low-density silica aerogel insulation using a closed-loop process that substitutes recycled CO2 and ethanol for the virgin inputs of conventional aerogel synthesis, targeting both the thermal performance advantages of aerogel and a substantially lower embodied-carbon footprint. The combination of feedstock circularity and aerogel's inherent thermal properties addresses two persistent problems in building envelope innovation simultaneously, and the €18M Series A in January 2025 provides some evidence of investor confidence in the scale-up pathway. The pilot plant has operated since 2022, which is a modest but real operational track record. The gaps that matter most for specification are the absence of any published EPD, independent LCA, or durability and moisture-performance data — the carbon benefit claims are unvalidated, and no named building or field deployment has been disclosed. Aerogel's inherent brittleness and handling complexity add site-labour considerations that are not addressed in available materials, and demolition-waste feedstock consistency across geographies is an undemonstrated supply-chain assumption. The product is interesting enough that a specifier working on a project with aggressive embodied-carbon targets and budget for early-adopter risk should open a dialogue with Keey; it is not yet in a position for mainstream specification without independent performance certification.

Strengths

Considerations

Risks

Performance

Reality check

Funding and pilot plant status are verified via Tech.eu (Jan 2025, Bpifrance SPI 2, WIND). Founding date (2015) and location (Alsace) are stated. However, no named customers, production volumes, third-party LCA, EPD, or performance data (thermal conductivity, cost vs. conventional aerogel, carbon payback period) are publicly available. The claim of 'major European clients' is unverified. The closed-loop process and waste feedstock are plausible but unaudited. No evidence of regulatory approvals (CE mark, building codes) or durability/field data.

#aerogel #thermal_insulation #circular_economy #construction_waste #low_carbon #closed_loop_production